For EPCs

We book the commercial and industrial projects your EPC team should be building.

We go to the owners, CFOs and facility managers of large sites, find the ones planning solar and book them with your team.

Paid per meeting that takes place. No retainer, no setup fee.

CFO call booked

Cold store, about 600 kWp

  • Owns the site
  • Planning this year
Example

What you get

We book the commercial and industrial projects your team should be building.

Projects before the tender

You talk to the owner while the project is still an idea, not when ten EPCs are bidding on it.

Every person who signs

The owner, the CFO and the facilities manager each get a message written for their role.

Your size, your timing

We check size, ownership and timing before anything lands in your calendar.

The scanner

We built our own software to find them.

It maps every site in your area, scores each one against your criteria and finds the person who decides. Then our team takes it from there.

Agentic Solar scanner
  • Roofs
  • Existing solar
  • Decision makers
Example view
IndustriestraßeGewerbepark SüdHafenstraßeSCORE 93SCORE 90N100 M

Cold store

Gewerbepark Süd

Site
About 600 kWp
Day load
High, cooling
Ownership
Owner occupied
Timing
Planning this year
Decision maker
CFO

Load per month

JFMAMJJASOND
Scanning your area
1,840Checked
212Fit your criteria
187Decision makers
  • Site above 250 kWp
  • High daytime energy use
  • Owns the site

Large sites in your region

  • Cold storeAbout 600 kWp · owner occupied
    96
  • FactoryAbout 900 kWp · high day load
    93
  • Logistics parkAbout 1.2 MWp · one owner
    90

How it works

Four steps, and three of them are on us.

  1. We find every factory, warehouse and cold store in your region with the roof and the energy use for a real project.

  2. We write to the owner, the CFO and the facilities manager, and each of them gets the angle that matters to them.

  3. Before a meeting is booked we check size, ownership and timing against your criteria.

  4. You walk in knowing the site, the decision maker and the timing.

Your criteria

Set on the first call
  • Site above 250 kWp
  • High daytime energy use
  • Owns the site
  • Planning within twelve months
  • CFO or managing director on the call

Only people who match every line get booked.

Email draft

Written for one company

Subject Solar for the cold store in Graz

Hi Andreas,

your cold store in Graz runs its cooling all day, which is exactly when a roof system produces.

A site like yours could carry about 600 kWp. Would a short call with our engineer make sense this month?

Read before writingWebsiteLinkedInMap data
Sends from a warmed inbox

Replies

Answered in 3 minutes
LeadWhat would that cost us?
Agentic SolarIt depends on the roof and the load. Here is a first estimate for your site, and our engineer can walk you through it. I can offer Tuesday 10:00 or Thursday 14:00 for a short call.
PDF

Your sitePhotos and numbers

Your calendar

Qualified
  • Site above 250 kWp
  • High daytime energy use
  • Owns the site
MonTueWedThuFri
10:00Booked

Tuesday, 10:00

Cold store, about 600 kWp

Unlike lead sellers and agencies

A system that turns your market into meetings.

01

Every large site in your region

We list every factory, warehouse and cold store with the roof and the energy use for a real project.

  • Roof and site size from map data
  • High daytime energy use
  • Owner occupied sites first

02

The right message for each role

The CFO hears about payback and cash flow, and the facilities manager hears about the roof and the operation.

  • Owner, CFO and facilities manager
  • Several touches per company
  • Written per site

One system

From the first email to the booked meeting, it runs as one system.

  • Find
  • Write
  • Answer
  • Book
  • Hand over

Questions

What epcs ask us first.

Read all questions

How big are the projects you target?

Whatever your sweet spot is. We set the minimum size with you, from a few hundred kWp up to megawatt sites.

Do you target storage too?

Yes, we can go after sites for PV and storage together, as long as you deliver both.

Can you really reach the CFO?

Every campaign writes to several people per company, and the CFO gets a different email than the facilities manager, because they care about different numbers.

Get in front of the projects before the tender.

Get in before the tender

Seven questions, two minutes, then you pick a time.